Uploaded image for project: 'Minimal Marketable Features'
  1. Minimal Marketable Features
  2. MMF-266

Show project activity to the developer as a timeline of analyses and associated events

    Details

    • Type: MMF
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Labels:

      Description

      As a user, I would like to see a timeline of analyses. For each analysis it should include:

      • date/time analysis report was submitted to the server
      • Quality Gate status
      • the version string if it's new in this analysis
      • linked indicator of quality profile change if applicable

      This puts all the data in the events section into the Activity Stream, so the events section should be dropped from the project front page.

      The project activity domain should include the 5( ? ) most recent analyses

      It might look something like this in the Project Space

      The click-through should bring me to a list of all analyses on record, each with this same data. If I have admin permissions on the project, I should also see actions:

      • create version event
      • rename existing version event
      • remove version event
      • create new (random) event
      • delete snapshot

      Adding these actions to the page replaces the History page, so it should be dropped.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                christophe.levis Christophe Levis
                Reporter:
                ann.campbell.2 Ann Campbell
              • Votes:
                3 Vote for this issue
                Watchers:
                9 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: