Uploaded image for project: 'Product Roadmaps'
  1. Product Roadmaps
  2. MMF-165

Remove the concept of Action Plans in SonarQube

    XMLWordPrintable

    Details

    • Type: MMF
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Labels:

      Description

      This concept was introduced a long time ago before the ability to tag issues and when the concepts of Quality Gates and Leak Period were not yet central in SonarQube. With tags, it's already possible to group issues and the usage of quality gate/leak period is THE way to very efficiently manage the technical debt so we don't want to provide two different competing ways to manage the technical debt in SonarQube. Moreover, ticket tracking tools like TFS or Jira are really the best place to really manage an action plan (with a due date, completion status, ...). So we prefer working to better support this use case through such tracking tools.

      TO BE SPECIFIED : the widgets/pages to be removed.

        Attachments

          Issue Links

            Activity

              People

              Assignee:
              fabrice.bellingard Fabrice Bellingard
              Reporter:
              freddy.mallet Freddy Mallet (Inactive)
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

                Dates

                Created:
                Updated:
                Resolved: